Skip to Main Content

Update: Abram St. Project Construction & Lane Closures

Here are the anticipated lane closures and traffic impacts for the coming weeks on and along Abram Street in Downtown Arlington. Closures and detours are subject to changes due to weather and schedule.

New or updated information is indicated in bold.

Pecan Street between Abram Street and Main Street

  • Pecan Street, between Abram and Main Streets, is closed to through traffic until Dec. 31, 2018. This closure is necessary to allow for the installation of new sewer lines and improvements to the stormwater drainage system. Visitors to the area can access the parking lot located between Pecan and Oak Street from Oak Street.

Cooper Street between UTA Boulevard and Main Street

  • The outside lane of northbound Cooper Street will be closed north of UTA Boulevard to Main Street through December 24 to allow for installation of new water line infrastructure. This closure will  not affect southbound traffic.

More Information

Track #myAbram or visit www.ArlingtonTX.gov/Abram to stay up-to-date on this transformative, two-year construction project.

Getting Around Downtown

Free parking is available throughout Downtown, including in the public lot west of City Hall, in the 101 Center Parking garage, along Front Street, and in the new reverse-angle parking spaces along Abram, Center and Mesquite streets.

Download Waze for free and see real-time traffic, find optimal routes and avoid road closures, or for only $3 take Via Arlington and leave your car at home.

Subscribe, Post, Tweet and Tag

Subscribe to Downtown Arlington’s weekly e-newsletter, follow us on FacebookTwitterYouTube and Instagram, and tag us with @dtArlington.

Updates provided by the City of Arlington and shared courtesy of DAMC.