Abram Street / Cultural Arts / Development / Entertainment / MyAbram / Transportation & Mobility
Aug 22, 2018
Milestone: Portion of Abram St. Revitalization at Levitt Pavilion Now Complete
Learn more about the $26 million Abram Street Revitalization Project in this month's episode of Street Tracker on MyArlingtonTV.
Street Tracker, which is produced by the City of Arlington, provides transparency and up-to-date information on both current and proposed street maintenance and construction projects throughout The American Dream City..
Getting Around Downtown
Free parking is available throughout Downtown, including in the public lot west of City Hall, in the 101 Center Parking garage, along Front Street, and in the new reverse-angle parking spaces along Abram, Center and Mesquite streets.
Abram Street will be open to two-way traffic throughout its two-year redevelopment. Track #myAbram and visit myAbram.com for the latest information about traffic routing and construction milestones. Download Waze for free and see real-time traffic, find optimal routes and avoid road closures, or for only $3 take Via Arlington and leave your car at home.
Subscribe, Post, Tweet and Tag
Subscribe to Downtown Arlington’s weekly e-newsletter, follow us on Facebook, Twitter, YouTube and Instagram, and tag us with @dtArlington.
Updates and Street Tracker provided by the City of Arlington and shared courtesy of DAMC.